A GM Problem Resolution Report (PRR) has just been issued against your part number. The plant quality contact has opened the formal escalation. Your supplier scorecard begins accumulating the impact. The next 72 hours determines whether this closes as a routine event or drags on for weeks as a scorecard problem.
This guide covers exactly how to respond to a PRR, what closure velocity looks like in 2026, and how to prevent PRRs from compounding into pattern issues that trigger Controlled Shipping. For emergency PRR response support, contact IDS at 905-260-2388.
What a PRR Actually Is
PRR (Problem Resolution Report) is GM's formal supplier quality event tracking system. It parallels Ford's GIR and Stellantis's TSV. When a plant quality contact issues a PRR, it enters the GM supplier quality database, begins accumulating scorecard impact, and stays open until the customer SQE confirms closure.
The First 72 Hours
Hour 0 to 4: Acknowledge and Assess
Same-day acknowledgment of the PRR notification to the plant quality contact. This is a written response, not a phone call. Establishes the supplier response tree and next-update commitment. See our first hour playbook.
Hour 4 to 24: Deploy On-Site
On-site presence at the customer plant within 24 hours for material events. This is where PRR closure velocity is actually decided. Suppliers responding remotely close PRRs 2 to 3 times slower than suppliers with on-site presence.
Hour 24 to 72: Containment Plan Documented
Written containment plan submitted to plant quality contact within 72 hours. Includes specific gauges, criteria, dates, and effectiveness verification approach. See containment management guide.
PRR Closure Sequence
- Containment complete: All suspect material inspected, quantities reported to customer
- Root cause identified: Documented via 5 Why or similar analysis, verified with data
- Permanent corrective action implemented: Process change in place, control plan updated
- Verification data collected: Statistically meaningful sample sizes demonstrating fix effectiveness
- Read-across analysis complete: Similar processes and programs assessed for the same failure mode
- 8D report submitted: Ford Global 8D format equivalent for GM programs, D1 through D8 complete
- Customer SQE closure confirmation: Formal PRR status change in the GM system
Common PRR Closure Failures
- D6 verification too thin: Three days of clean shipments is not verification. Statistically meaningful sample sizes required.
- Containment scope under-scoped: Missing supplier dock, in-transit, or customer dock coverage produces re-escapes.
- Root cause too shallow: "Operator error" is not root cause. 5 Why analysis must reach systemic factors.
- Communication cadence too slow: Silence between customer contact and closure signals disengagement.
- No read-across analysis: Fixing the specific defect without checking similar programs invites repeat PRRs.
Preventing PRRs from Compounding
Two or three unrelated PRRs in a rolling 6-month window trigger GM SQE elevated scrutiny. Four or more in the same window can trigger Controlled Shipping Level 1 (CS1). See our Controlled Shipping guide.